Skip to content
Magna Studio
Menu

Service · London and the Home Counties

Building Regulations Drawings for London Extensions and Lofts

Building Regulations drawings show how your extension or loft conversion will be built safely: structure, fire escape, insulation, ventilation, drainage and access. Planning decides whether you may build; this package satisfies building control and gives your builder something to price accurately. It is for London homeowners who have planning permission or an LDC and are ready to move towards construction.

Indicative fee in two minutes. Written fixed-fee quote within 24 hours.

Fee model
Fixed-fee bands
Typical timeline
Within 24 hours + About 1 week
Coverage
London and the Home Counties
Quote
Within 24 hours
01Who this is for

Is this the right service for your project?

  • Homeowners with planning permission or an LDC who need drawings for building control
  • Owners who want accurate, comparable builder quotes rather than estimates from planning drawings
  • Anyone converting a loft, where fire escape and structure are tightly regulated
  • Homeowners whose builder has asked for a full plans submission rather than a building notice
02Scope

What's included, and what isn't

Every quote lists exactly these items. No surprises after you've signed.

What's included

  • Construction plans, sections and details at 1:50 and 1:20 or larger
  • Written specification covering materials, insulation, fire protection and finishes
  • Compliance notes against Approved Documents A, B, C, F, K, L, M and P
  • Coordination of the structural engineer's calculations and beam schedule
  • Fire strategy for loft conversions, including protected stair and alarm layout
  • Thermal element and U-value schedule to Part L
  • Drainage layout and connection details
  • Full plans submission to your chosen building control body
  • Responses to building control plan-check comments until approval

Not included (we coordinate these)

  • Structural engineer's fee and calculations (typically £600–£1,500, coordinated by us)
  • Building control fees, whether council or registered building control approver
  • Party wall notices and surveyor
  • SAP or energy calculations where required, quoted separately
  • Contractor tendering and site inspection, available in the full package
03Process

How it works and how long it takes

  1. Step 01Within 24 hours

    Fixed-fee quote

    We confirm scope from your approved planning drawings and quote the package in writing.

  2. Step 02About 1 week

    Design freeze and engineer brief

    We fix the approved design, confirm any changes since planning and brief the structural engineer on beams, foundations and openings.

  3. Step 033–5 weeks

    Building Regulations drawings

    Construction drawings, details and specification coordinated with the engineer's calculations as they arrive.

  4. Step 04Within 2 working days of sign-off

    Submission to building control

    Full plans application lodged with the council or a registered building control approver of your choice.

  5. Step 05Typically 5–8 weeks

    Plan check and approval

    We answer any comments from the plan checker and issue amended drawings until approval.

04Fees

How our fixed fee for building regulations drawings works

One fee, agreed in writing before you commit. Answer six questions and we email you an indicative estimate for your project.

Priced as a fixed fee

  • Single-storey rear or side extension
  • Two-storey extension
  • Wraparound extension
  • Loft conversion with rear dormer
  • Mansard loft conversion
Project type and size
A rear dormer costs less to document than a mansard; a two-storey extension more than a single storey.
Property and constraints
Flats, detached houses, conservation areas and listed buildings need more drawings and a fuller planning case.
How far we take it
Planning drawings only, planning plus Building Regulations, or the full package to tender-ready details.
Indicative pricing

Indicative Magna Studio fee for the Building Regulations package on a medium-sized project, typically 110–140% of the planning fee for the same project. Excludes VAT, structural engineer, building control fee, party wall surveyor and energy calculations.

Council fees, building control fees, structural engineer, party wall surveyor and specialist reports are always separate. We list them in every quote.

Get your instant estimate

Once permission is granted, the next question your builder asks is “have you got the Building Regs drawings?” Without them, contractors price on assumptions, building control finds problems on site, and the cost of the project drifts. Our Building Regulations package turns approved planning drawings into a construction set that a plan checker can approve and a builder can price line by line, whether your house is in Croydon, Barnet or Hackney.

What are Building Regulations drawings and do you need them?

Building Regulations set minimum standards for how buildings are constructed in England. Compliance is demonstrated through the Approved Documents, each covering one topic. For a typical London extension or loft the ones that drive the drawings are Part A (structure), Part B (fire safety), Part C (damp and ground conditions), Part F (ventilation), Part K (stairs and guarding), Part L (energy), Part M (access) and Part P (electrics). If you are extending, converting a loft, removing a chimney breast or forming a large opening, you need approval. The drawings are how you show compliance before work starts.

What’s included

We develop your approved planning drawings into construction plans, sections and details at 1:50 and 1:20 or larger, with a written specification for materials, insulation, fire protection and finishes. We brief and coordinate your structural engineer so beams, padstones and foundations appear correctly on the drawings, and we set out the fire strategy for a loft conversion: the protected stair enclosure, fire doors and interlinked alarms Part B requires when a two-storey house becomes three. A U-value schedule shows Part L compliance for every new wall, roof and floor. We then submit a full plans application to your chosen building control body and answer plan-check comments until approval.

What’s not included

The structural engineer’s fee (typically £600–£1,500 depending on scope) and the building control fee are paid directly to them. Party wall notices and any SAP energy calculations are also excluded and quoted separately if required. Tendering and site inspection sit in our full design and documentation package. If you do not yet have planning permission or an LDC, start with planning documentation and we will carry the survey and drawings forward.

Process and timeline

Stage Duration
Written fixed-fee quote Within 24 hours
Design freeze and engineer brief About 1 week
Building Regulations drawings and specification 3–5 weeks
Full plans submission Within 2 working days of sign-off
Plan check and approval Typically 5–8 weeks

The package can start while the planning application is still being decided if you are confident of the outcome; that overlap can save a month before construction.

Fees

The Building Regulations package is priced as a fixed fee per project. As a rule of thumb it adds 110–140% to the planning fee for the same extension or loft, with the exact figure depending on size, structure and whether the house is in a conservation area or listed. Answer six questions in the quote tool and we email you an indicative figure for planning and Building Regulations together, then confirm it in writing within 24 hours.

For the planning stage that precedes this work, read our guides to householder planning applications in London and loft conversion design fees in London. Borough building control teams differ in workload; see our pages for Croydon, Barnet, Hackney and Richmond upon Thames.

Ready for construction drawings? Get an instant estimate and we will confirm scope and programme within 24 hours.

05Questions

Frequently asked questions

Do I need Building Regulations drawings if I have planning permission?

Yes. Planning permission and Building Regulations approval are separate. Planning covers appearance and neighbour impact; Building Regulations cover structure, fire safety, insulation, ventilation and drainage. Almost every extension and every loft conversion in London needs Building Regulations approval, and a full plans submission with proper drawings is the safest way to get it.

Full plans or building notice, which should I use?

A building notice lets work start after 48 hours with no drawings checked in advance, so problems are found on site where they cost the most to fix. A full plans application is checked before you build and gives you an approval notice and a clear scope for the builder. For anything beyond minor works we recommend full plans, and lenders and buyers prefer it.

Who checks the drawings, the council or a private inspector?

Either. You can use your borough's building control team or a registered building control approver (formerly an approved inspector). Both work to the same Approved Documents and issue a completion certificate. We submit to whichever you choose and handle the plan-check comments.

How much do Building Regulations drawings cost in London?

The Building Regulations package is a fixed fee, typically 110–140% of the planning fee for the same project, excluding VAT. The quote tool at /quote emails you an indicative figure for your project within minutes. The structural engineer usually adds £600–£1,500 and the building control fee is set by the body you choose.

06Examples

Example projects

Typical projects showing the constraints we work through and the planning route we would take.

Proposed loft floor plan for an L-shaped rear dormer loft conversion on a Victorian terrace in HackneyExample project
Loft conversionStoke Newington, Hackney

Loft Conversion in Stoke Newington, Hackney

L-shaped rear dormer loft conversion to a two-storey Victorian terrace, adding a double bedroom and en-suite within the 40 m³ permitted development allowance.

Typical route: Permitted development, proved with a Lawful Development Certificate

Proposed ground floor plan of a two-storey rear extension and side infill to a 1930s semi in EalingExample project
Two-storey extensionNorthfields, Ealing

Two-Storey Extension in Northfields, Ealing

Two-storey rear extension with a single-storey side infill to a 1930s semi-detached house, adding a kitchen-dining room, a fourth bedroom and a family bathroom.

Typical route: Householder planning application for both storeys in one submission

Proposed ground floor plan of a side extension and garage conversion to a 1930s semi in Finchley, BarnetExample project
Side extensionFinchley, Barnet

Side Extension and Garage Conversion in Finchley, Barnet

Conversion of an attached garage and a single-storey side extension behind it to a 1930s semi-detached house, widening the kitchen and adding a utility room and WC.

Typical route: Householder planning application, as the width exceeds the PD limit

Proposed loft floor plan for a hip-to-gable and rear dormer conversion to an Edwardian semi in TwickenhamExample project
Loft conversionTwickenham, Richmond

Loft Conversion in Twickenham, Richmond upon Thames

Hip-to-gable roof extension with a rear dormer to an Edwardian semi-detached house in a Twickenham conservation area, creating a master bedroom and bathroom in the roof.

Typical route: Householder planning application in an Article 4 conservation area

07Guides

Read before you start

GuideUpdated Sept 2026

How much does an architect cost for a loft conversion in London?

For a London loft conversion the design fee is set by the roof form: a rear dormer sits at the bottom of the range, a hip-to-gable in the middle and a mansard at the top, with ballpark figures for each in the table below. A Building Regulations package typically adds 110–140% of that planning fee. Council fees (£264 for a Lawful Development Certificate, £528 for a householder application), the structural engineer and any party wall surveyor are separate, and the quote tool gives you an indicative figure for your own loft.

GuideUpdated Sept 2026

Class MA office-to-residential conversions in London: a practical guide

Class MA is a permitted development right that lets a Class E building (offices, shops, services) change to C3 homes through prior approval rather than full planning. The building must have been in Class E for two years and vacant for three months, floorspace is capped at 1,500 m² (verify: the rules changed in 2024), the council fee is £250 per new home and the decision period is 56 days. Prior approval tests cover transport, contamination, flooding, noise, natural light and space standards, and Article 4 directions remove the right across much of central London, so check the site before you buy.

GuideUpdated Sept 2026

Conservation areas in London: what they mean for your extension or loft

A conservation area does not stop you extending, but it narrows your options. Roof extensions such as dormers lose permitted development rights automatically, side extensions and cladding are excluded, and many London boroughs add Article 4 directions that remove rear-extension rights too, so most work needs a householder application (8 weeks, £528). The council then judges whether the design preserves or enhances the area's character, which usually means subordinate massing, matching brick and traditional window proportions.

Next step

Ready to move forward? Get your quote now.

Answer six questions and your indicative fee arrives on screen and by email. Written fixed-fee quote within 24 hours.