Skip to content
Magna Studio
Menu

Guide · Updated 24 September 2026

How much does an architect cost in London?

Short answer

For planning drawings and submission on a typical London home, expect a fixed fee of around £1,900–£2,500 for a single-storey rear extension, £3,000–£3,800 for a two-storey extension, £2,000–£2,600 for a rear-dormer loft, £2,800–£3,400 for a mansard and £1,300–£1,700 for a garden room, excluding VAT. A Building Regulations package typically adds 110–140% of the planning fee. Council fees, the structural engineer, party wall surveyors and building control are always separate. The quote tool gives you an indicative figure for your own project in two minutes.

If you have searched “how much does an architect cost” you have probably found percentage fees, hourly rates and stage fees that are hard to compare. This guide gives our indicative fixed fees for the planning and Building Regulations stages by project type, explains what pushes a fee up or down, and lists the third-party costs that sit outside any designer’s fee so you can budget the whole thing.

A note on who we are: Magna Studio are architectural designers, not architects registered with the Architects Registration Board (ARB), so we do not use that title. Planning, Lawful Development Certificate and Building Regulations drawings do not legally require a registered architect; the drawings, the process and the council’s decision are the same whoever prepares them. The fees below are our own bands as architectural designers.

How are design fees charged in London?

There are three common models, and the model matters as much as the number:

  • Percentage of construction cost. Traditional for full-service appointments, typically quoted as a share of the build budget across every stage. The fee rises if the build gets more expensive, which is the wrong incentive on a project with a clear brief, and you do not know the figure until the build is priced.
  • Hourly or day rate. Common for small pieces of advice and for feasibility work. Fine for a defined hour of advice, hard to budget for a whole planning stage.
  • Fixed fee per stage. A stated figure for the planning stage and another for the Building Regulations stage, agreed before any work starts, with the scope and the number of revision rounds written down. This is how we quote.

How much do planning drawings cost by project type?

Our planning-stage fee covers the measured survey, existing and proposed drawings to the council’s validation checklist, the planning route advice, any statement the route needs, submission through the Planning Portal and acting as your agent until the decision. For a medium-sized London home the indicative bands are:

Project Indicative planning-stage fee (excl. VAT)
Single-storey rear or side extension £1,900–£2,500
Wraparound (rear and side) extension £2,800–£3,500
Two-storey extension £3,000–£3,800
Loft conversion with rear dormer £2,000–£2,600
Hip-to-gable loft with rear dormer £2,200–£2,800
Mansard loft £2,800–£3,400
Outbuilding, garden room or annexe £1,300–£1,700
Internal alterations only £1,100–£1,500

These bands are indicative and rounded to the nearest £50; your written quote is the fixed figure. Smaller projects sit below the band and larger ones above it. For loft-specific detail see how much an architect costs for a loft conversion; for extensions see how much an architect costs for a house extension.

How much does the Building Regulations package add?

A Building Regulations package typically adds 110–140% of the planning fee. For a rear extension quoted at £2,200 for planning, expect roughly £2,400–£3,100 for the construction drawings and specification. The package covers structure (coordinated with your engineer’s calculations), thermal performance, fire, ventilation, drainage and the details building control checks, and it takes 3–5 weeks. It can start while the council is deciding the planning application.

A full package, adding a concept stage before planning and tender-ready details after Building Regulations, typically adds a further 35–55% on top of the two stages together. Most London extensions and lofts do not need it; the two stages above are what you need to obtain consent and get comparable builder quotes.

What makes the fee higher or lower?

  • Size. A 25 m² kitchen extension and a 45 m² wraparound are different amounts of drawing, so each band has a small, medium and large figure.
  • Planning route. A Lawful Development Certificate for permitted development is quicker to prepare than a full planning application, which needs a design statement and often negotiation with the case officer.
  • Heritage status. A conservation area adds a modest uplift, typically around 15%, because the design has to answer the character appraisal and usually a published design guide. A listed building adds around 30%, because listed building consent needs a heritage statement and far more detail.
  • Property type. Flats and maisonettes carry roughly a 10% uplift: they have no permitted development rights, the freeholder’s consent is usually needed and fire strategy involves the whole building. Detached houses carry around 5% for the extra elevations and roof.
  • Previous extensions. Anything added since the house was built counts against the permitted development allowance, so the assessment takes longer and the project more often needs full planning.

What is included in a fixed fee, and what is never included?

Included in our planning-stage fee: the measured survey, existing and proposed plans, elevations and sections, the site location and block plans, the planning route assessment, any Design and Access, heritage or permitted development statement the route requires, submission, validation queries, one round of revisions after your review and correspondence with the case officer until the decision. The written proposal lists every drawing by name.

Never included, because they are paid to other people: VAT; the council’s application fee (£528 for a householder application, £264 for a proposed-use Lawful Development Certificate in England from April 2025, verify before applying); building control charges; the structural engineer; a party wall surveyor; and specialist reports such as arboricultural, flood risk, daylight and sunlight or heritage assessments. We tell you which of these your project needs before you commit and list each in the proposal with a typical range. For the whole budget, council fee to builder, see how much planning permission costs in London.

Do fees include VAT?

No. Fees on this site and in our quotes are the practice fee excluding VAT, which is added at the prevailing rate. Council application fees do not attract VAT. Your written quote shows the fee, the VAT and the total so a comparison with another quote is straightforward.

How many revisions are included?

Each quote states the number of revision rounds at each stage, so you know before you start. Adjustments to a design within the agreed brief are part of the fee. A change to the brief itself, such as adding a storey or switching from a dormer to a mansard, is a scope change, and we quote for it in writing before doing the work. The fee does not change unless you change the scope.

How do I compare quotes fairly?

Ask each practice for the same five things and put them side by side:

  1. The fee for the planning stage and, separately, for the Building Regulations stage, each excluding VAT.
  2. Whether the measured survey is included or a separate charge.
  3. The list of drawings and documents each stage delivers.
  4. The number of revision rounds included, and what counts as a scope change.
  5. Who acts as agent with the council, and whether that continues until the decision.

A low headline fee with the survey, the statements and the agent role stripped out is usually the more expensive option once those are added back.

How long does each stage take?

  • Measured survey booked within 1 week of instruction.
  • Planning or LDC drawings issued 2–3 weeks after the survey.
  • Submission within 2 working days of your sign-off.
  • Council decision: 8 weeks from validation for both a householder application and an LDC.
  • Building Regulations package: 3–5 weeks.

How do I get my own figure?

Answer six questions in the quote tool and an indicative fee for your project arrives on screen and by email in two minutes. A written fixed-fee quote follows within 24 hours of a short conversation about the property. We work across every London borough and the towns around the capital, from Hackney and Croydon to Sevenoaks and St Albans, on the same fee bands.

02More questions

Frequently asked questions

Do I need an architect at all for an extension or loft?

Not legally. Planning applications, Lawful Development Certificates and Building Regulations submissions can be prepared by anyone, and councils treat the drawings the same whoever draws them. What you need is a measured survey, drawings to the council's validation checklist, a sound read of the planning route and a construction package a builder can price. An architectural designer provides all of that for a fixed fee. A registered architect is worth considering for a large new-build or a complex listed building.

Is it cheaper to let the builder do the drawings?

Sometimes on paper, rarely in practice. Design-and-build drawings belong to that builder's process, so you cannot take them to two other contractors for competing quotes, and the planning route is assessed by the party who profits from starting on site. An independent set costs a defined fee and gives you a package any builder can price, which usually saves more than the fee on the build.

Are your fees the same across London and the towns around it?

Yes. The fee is set by the project type, its size, the property type and its heritage status, not by the postcode. A rear extension in Sevenoaks or St Albans is quoted from the same bands as one in Croydon or Hackney. What changes between councils is the planning route and the local constraints, which we check before we quote.

Is there a charge for the first conversation?

No. The instant estimate, the call to discuss your project and the written fixed-fee quote are all free. The fee starts when you instruct us and we book the measured survey.

What does 'planning-ready' mean in your quote?

A set of drawings and documents that meets your council's validation checklist, so the application is registered first time and the 8-week clock starts without a validation query. It is not a promise of approval; the council decides. If a council refuses an application we designed and advised on, we revise and resubmit at no further design fee under the terms of our approval commitment.

03Examples

Example projects that face these questions

Proposed loft floor plan for an L-shaped rear dormer loft conversion on a Victorian terrace in HackneyExample project
Loft conversionStoke Newington, Hackney

Loft Conversion in Stoke Newington, Hackney

L-shaped rear dormer loft conversion to a two-storey Victorian terrace, adding a double bedroom and en-suite within the 40 m³ permitted development allowance.

Typical route: Permitted development, proved with a Lawful Development Certificate

Proposed loft floor plan for a hip-to-gable and rear dormer conversion to an Edwardian semi in TwickenhamExample project
Loft conversionTwickenham, Richmond

Loft Conversion in Twickenham, Richmond upon Thames

Hip-to-gable roof extension with a rear dormer to an Edwardian semi-detached house in a Twickenham conservation area, creating a master bedroom and bathroom in the roof.

Typical route: Householder planning application in an Article 4 conservation area

Proposed ground floor plan of a 3.5 m deep rear extension to a Victorian terrace in Highbury, IslingtonExample project
Rear extensionHighbury, Islington

Rear Extension in Highbury, Islington

Full-width single-storey rear extension, 3.5 m deep with three rooflights, to a Victorian terrace in a Highbury conservation area, creating an open kitchen and dining room.

Typical route: Householder planning application in a conservation area

Next step

Ready to move forward?

Answer six questions and your indicative fee arrives on screen and by email. Written fixed-fee quote within 24 hours.

Get an instant estimate

or call +44 20 3400 9917 · WhatsApp us

Free and without obligation. Nothing to pay until you accept a written fee proposal.