Do I need planning permission for a side extension in Merton?

Short answer

Often not. A single-storey side extension no wider than half the original house and no higher than 4 m is normally permitted development; anything wider, any two-storey side extension and any extension to a flat needs planning permission. In a conservation area a side extension always needs planning permission. Merton has conservation areas and Article 4 directions that remove some permitted development rights, so we check the address on Merton's constraints map before advising a route.

Get an instant estimateIndicative fee in two minutes. Written fixed-fee quote within 24 hours.

Side extensions in Merton depend on the house. Typical homes here: Victorian terraces in Colliers Wood, South Wimbledon, Mitcham and around Haydons Road; Edwardian houses in Wimbledon Park, Raynes Park and West Wimbledon. Designations to check first: Conservation areas; Article 4 directions; River Wandle flood zones. Applications are decided by London Borough of Merton and the Merton Local Plan.

The permitted development rules for side extensions

A single-storey side extension is permitted development on a house if it is no wider than half the width of the original house, no higher than 4 m, with eaves no higher than 3 m where it comes within 2 m of a boundary, and finished in materials similar in appearance to the house.

Anything wider than half the original house, any two-storey side extension, and any side extension on a flat needs planning permission. Garage conversions that keep the walls are usually permitted development; extending beyond them is assessed as a side extension.

What changes in Merton

Side extensions are not permitted development in a conservation area at all, so there a planning application is always required.

The local constraints that most often decide the route in Merton are listed below, taken from our Merton area page. Each one is a reason to confirm the address on Merton's constraints map before relying on permitted development.

  • Conservation areas. Merton has numerous conservation areas, concentrated in Wimbledon Village, Wimbledon Park, Merton Park, Mitcham Cricket Green and along the Wandle. Source
  • Article 4 directions. Several Merton conservation areas, including Merton Park and parts of Wimbledon, are understood to carry Article 4 directions removing permitted development for front alterations, windows and boundary treatments.
  • River Wandle flood zones. The Wandle runs through Mitcham, Colliers Wood, Merton Abbey and Wandsworth-bound Earlsfield. Source
  • Metropolitan Open Land and Green Belt. Wimbledon Common, Wimbledon Park, Mitcham Common, Morden Hall Park and Cannizaro Park are Metropolitan Open Land, and the borough's south-western edge includes Green Belt.
  • Listed buildings and Wimbledon Village character. Wimbledon Village, Merton Park and Mitcham Cricket Green contain many listed buildings and locally listed houses.

What Merton planning officers look for

Merton's officers follow the London-wide conventions for householder extensions, and refusals most often cite excessive depth beyond neighbouring precedent, breach of the 45-degree rule or bulky roof extensions. On 1930s streets in Morden and Mitcham side extensions are expected to be set back and lower than the main roof so the gap between semis is kept. Pre-application advice is available for a fee.

Fees and timelines

Merton decides a householder application or a Lawful Development Certificate within 8 weeks of validation. The council fee is £528 for a householder application and £264 for a Lawful Development Certificate (England, from 1 April 2025; verify before applying).

Our own fee is fixed once quoted. The quote tool gives an indicative figure in minutes and a written quote follows within 24 hours.

Primary sources

02Questions

Side extensions in Merton: common questions

Why is half the width of the house the limit?

Class A of the permitted development order caps a side extension at half the width of the original house so that pairs of semis and rows of houses keep the gaps between them. Even 200 mm over the limit takes the whole extension out of permitted development.

Can I convert the garage at the same time?

Usually yes. Converting an attached garage within its existing walls is normally permitted development, and we draw the conversion and the side extension as one scheme so the front elevation reads as a single design.

Will the council ask for a set-back at the front?

Most councils expect a side extension to be set back from the front wall and to sit below the main ridge so it reads as subordinate. Where planning permission is needed, that is the first thing officers check.

How long does Merton take to decide?

The statutory period is 8 weeks from validation for both a householder application and a Lawful Development Certificate, and 42 days for a larger home extension prior approval. Busy periods can push decisions past the statutory date; we tell you where the council is running.

03Examples

Example projects that face these questions

Proposed ground floor plan of a side extension and garage conversion to a 1930s semi in Finchley, BarnetExample project
Side extensionFinchley, Barnet

Side Extension and Garage Conversion in Finchley, Barnet

Conversion of an attached garage and a single-storey side extension behind it to a 1930s semi-detached house, widening the kitchen and adding a utility room and WC.

Typical route: Householder planning application, as the width exceeds the PD limit

Next step

Planning a side extension in Merton?

Answer six questions and your indicative fee arrives on screen and by email. Written fixed-fee quote within 24 hours.