Do I need planning permission for a two-storey extension in Epsom and Ewell?

Short answer

Usually yes. A two-storey rear extension is permitted development only if it is no more than 3 m deep and at least 7 m from the rear boundary, which most London plots cannot meet, so a householder planning application is the normal route. In a conservation area a two-storey extension always needs planning permission. Epsom and Ewell has conservation areas and Article 4 directions that remove some permitted development rights, so we check the address on Epsom and Ewell's constraints map before advising a route.

Get an instant estimateIndicative fee in two minutes. Written fixed-fee quote within 24 hours.

The permitted development rules for two-storey extensions

A two-storey rear extension is permitted development only within tight limits: no more than 3 m deep, at least 7 m from the rear boundary, no higher than the existing house, eaves matching the existing eaves, materials similar in appearance, and any upper-floor side window obscure-glazed and non-opening below 1.7 m.

Most two-storey extensions exceed one of those limits, most often the 7 m rear boundary rule on London plots, so the usual route is a householder planning application. Flats have no permitted development rights.

What changes in Epsom and Ewell

Extensions of more than one storey are not permitted development in a conservation area, so planning permission is always needed there.

The local constraints that most often decide the route in Epsom and Ewell are listed below, taken from our Epsom and Ewell area page. Each one is a reason to confirm the address on Epsom and Ewell's constraints map before relying on permitted development.

  • Green Belt. A large share of the borough is Green Belt, including Epsom Common, Epsom Downs, the Hogsmill open space and land around Horton and Langley Vale. Where planning permission is needed, extensions to houses in the Green Belt must not be disproportionate to the original dwelling, and outbuildings face a stricter test on size, siting and effect on openness. Check the council's constraints map to see whether your plot is inside the boundary. Source
  • Conservation areas. Epsom town centre, Ewell Village, Stamford Green and Woodcote are among the borough's conservation areas. Roof extensions are not permitted development inside them, and officers apply the character appraisal to extensions, dormers and boundary treatments. Check the council's constraints map for the exact boundaries before relying on permitted development. Source
  • Hogsmill River flood risk. The Hogsmill River rises at Ewell and runs through Ewell Village, West Ewell and on towards Kingston, and land alongside it and its tributaries sits in Flood Zones 2 and 3. Ground-floor extensions, basements and outbuildings there may need a flood risk statement with the application. Source
  • Article 4 directions. The council has used, or has consulted on using, Article 4 directions to remove particular permitted development rights, including for converting houses into small houses in multiple occupation and for works in some conservation areas. The position changes over time, so check the council's constraints map and current directions for your address before relying on permitted development. Source
  • Listed buildings. Ewell Village, Epsom town centre and the old hospital estate at Horton contain listed houses, cottages, churches and institutional buildings. Listed building consent is needed for almost any alteration, internal or external. Source

What Epsom and Ewell planning officers look for

Epsom and Ewell Borough Council officers assess householder applications against the Core Strategy, the saved Development Management Policies and the council's supplementary guidance on residential extensions, with the emerging Local Plan carrying growing weight. On the 1930s semis that dominate Stoneleigh, West Ewell and Ewell they tend to look for two-storey side extensions set back from the front wall and below the main ridge, a gap kept to the side boundary so the pair does not read as a terrace, and rear extensions that pass the 45-degree test to the neighbour's nearest habitable window. In Woodcote and around Epsom Downs plot coverage, tree protection and the spacious character of the road carry more weight. In the Green Belt officers usually measure the extension against the original dwelling by floorspace or volume and treat outbuildings more strictly. Common refusal reasons are full-width box dormers, side extensions that create a terracing effect, and roof extensions on front slopes in conservation areas. The council offers a paid pre-application service. Decisions can run past the statutory 8 weeks; allow 8–12 weeks.

Fees and timelines

The council fee for a householder application is £528 and for a Lawful Development Certificate £264 (England, from 1 April 2025; verify before applying). Both are decided within 8 weeks of validation.

Our own fee for the drawings and the application is fixed once quoted and depends on the project type, its size and the constraints above. Answer six questions in the quote tool and we email you an indicative figure within minutes, then a written fixed-fee quote within 24 hours.

02Questions

Two-storey extensions in Epsom and Ewell: common questions

What is the 45-degree test?

A line drawn at 45 degrees from the centre of the neighbour's nearest habitable room window. If your first-floor extension crosses it, officers treat it as harming their daylight and will ask for the depth to be reduced or the extension set in from the boundary. We plot it on every two-storey scheme before submission.

Can the ground floor go deeper than the first floor?

Yes, and it usually should. A common approach is a 4 m ground floor with a 3 m first floor set 1 m in from the shared boundary, which keeps the daylight line clear while giving a full-width kitchen below.

Does the roof have to match?

Councils expect the extension roof to follow the form of the main roof, for example a hipped roof on a 1930s semi, and to sit below the existing ridge. A flat-roofed first floor is normally refused on a pitched-roof house.

How long does Epsom and Ewell take to decide?

The statutory period is 8 weeks from validation for both a householder application and a Lawful Development Certificate, and 42 days for a larger home extension prior approval. Decisions can run past the statutory 8 weeks; allow 8–12 weeks.